Well the title says it all, the demo is all done so now it's putting it all back together. Well not quite. I have one bit to finish and that's below the window this and the window has to come out so I can fit the door that will lead to the veranda. Monday I will go and get the wall insulation boards so I can insulate the three walls that are not insulated. I am getting plaster board that has insulation on the back of it, when I went to the builders to enquire about it he spoke English and explained that you just put the adhesive on the wall and push the panel against it. We would say that you dot and dab it. It didn't matter I understood him. At 25€ a sheet it's not cheap but it would waste having the ceiling done and leaving the walls uninsulated.
The wall below the window will not be removed until the day the door company call to fit the door they not only make the doors but fitting is part of the price. On Saturday I had nothing to do so I got the stone cutter out to make the first cut where the door will be getting fitted. Not having anything to do all weekend and saying I was not going to start any other jobs till this one was finished, well I had time on my hands so I drilled and positioned the back plate where the air con was going in the living room. I had a 65 mm hole cutter but mine was for timber or plaster board. I had to cut through stone so I needed a 65 mm stone cutter. I have a friend who has a 65 mm hole cutter so I will be using that.
The next step now I have the cable is to lay the pipe into the wall for the electrics to go into I will be having 4 twin sockets also a socket for the TV or Monitor above the fridge freezer.
No comments:
Post a Comment