Ceiling up, cable and lights done.

This week i have finished the ceiling in my bathroom. I was told a tip buy my joiner friend, he said to screw a piece of timber to the wall just below the ceiling and push the plasterboard into the gap. The picture below has been recreated to show just how i got the sheet of plasterboard up and in position. I put a piece of wood on top of the open shutters and put the timber you can see up to hold the plasterboard up. Easy when you have everything to hand. All cabling and lighting is done in preparation for when i go full solar sometime next year.


The gap at the top of the ceiling on the left is for the cable to go for the extractor fan. The fan will be at the side of the window just below the ceiling on the left.

The lighting is up and wired ready to be connected also as you can see the cables are in ready for the lights and switches. All wiring is from a consumer unit in the cellar, i intend to have a separate consumer unit in the cellar for each room. Only the underfloor heating and extractor fan now need to be installed and when they arrive from the UK that will be done.

No comments:

Post a Comment