Peter's Blog

Iberianspices spicesiberia

Tuesday 27 January 2015

Insulating now almost finished

Since i arrived back from the UK i have been busy getting the rest of the insulating done in the lounge. I have plaster boarded below the aircon unit and also under the stairs and also the first part of the stairs that comes down from the loft.

The floor was insulated first a couple of years ago when i first arrived here. Now all the internal lounge walls are completed apart from painting but with a bit of work the painting should be finished by the end of this week.

I have also polished the timber for my corner TV unit that should be put back into position i hope by the end of this week.

Here is the wall under the aircon unit insulated before the plaster board was put in position.












Here is the wall now that the plaster board has been put into position rubbed down and ready to be painted. There is still one bit to complete and that's where the aircon unit is but that can wait as the main bit has been finished.
The wholes on the left are for sockets behind the TV unit.





I combat heat lose through the walls at the side and under the stairs they got the same insulating treatment as all the other external walls. Rubbed down and now just painting is needed for ts part to be completed.








As can be seen the insulating and painting has now finished and also the TV unit has been put back in position. Over the coming weeks doors will be made for the TV unit.






I need a sheet of plaster board to complete the side of the stairs as you can see from this photo then the ceiling can be boarded and insulated.

No comments:

Post a Comment