I have wanted to get my floor laid since i did the first coat of wax. But i needed to paint the room before the flooring went down however i needed to plasterer to come back. Because i had made a start on one part of the ceiling the plasterer left that thinking i was going to finish it myself. Today at 8am and by 9.30am he had finished an now all i need to do is wait for it to dry.
The strip down the center of the ceiling is the part that i have to wait till it dries. Only a couple of days and i can finish the painting of the whole room. Then the floor.
No comments:
Post a Comment