Peter's Blog

Iberianspices spicesiberia

Tuesday, 27 October 2015

Now the loft is being insulated to make a master bedroom

While I wait for materials for jobs I am in the middle of I carry on with other works. I have started on the master bedroom in in what is my loft. I have started to insulate the roof joists and I have started to plasterboard over the insulation. I have laid in the pipe work for the electrics ready for the lighting.

From the picture you can see the insulated board behind the plasterboard. At the top of the plasterboard I was lowering the centre of the ceiling as the picture shows a piece of insulation in place as a guide. Now I am putting more plasterboard up to the level of the blue plasterboard to have the ceiling that bit higher. The reason to change the ceiling height is so I can install the lighting I want. By the time I am finished I will have all my lighting on LED lights but also being run from solar energy, but that's another story.




No comments:

Post a Comment