Even the veranda has been set in

I went down today to see a house lower down the village from my to see how the renovating was coming on. As the outside wall was taken down and a new floor was to be built. Before the new outside wall was to be built but not before the base for the veranda was installed at the same time.
























The steel cage in the middle is for a concrete pillar to be built in the corner 

Here we are a few hours later and nearly half the beams are in place. Where they look to be to long they are in fact the veranda. The veranda will be 1.3 metres or about 4 and a half feet wide.

The blocks are in place to space out the floor beams before they are filled in. On top will be 50mm of  a cement screed to level the floor.