Peter's Blog

Iberianspices spicesiberia

Saturday 21 November 2020

A huge paint job

 Once the veranda was started to be rebuilt i knew i had to then paint the veranda once finished.

The rest of the outside walls needed painting and now that i have a power washer i have started the job. I am only doing small amounts of the outside walls as they first need cleaning and then i have to wait till the walls dry. 

At the bottom of the walls water gets in and the bottom of the wall needs to be repaired. I will clean out the gap and then fill the gap with cement to stop the water leak before the rains come.

No comments:

Post a Comment